514 RPM, 4 X 1000 kVA, 60 Hz, 110/208 V
HISTORYThis diesel power generating plant was built during cold war era to meet the needs of Missile Squadron of US Air Force. The plant was built and maintained to the highest military standards. The Squadron was relocated and power plant became decommissioned after being preserved for instant military use in the the event of state emergency. The plant is ready to be disassembled and installed into a new location.
SPECIFICATIONS
Engine | (4) Nordberg Model FS-136-ISC, 6-cylinder In Line Diesel Engine, 13" Bore, 16-1/2" Stroke, 514 RPM, 1135 HP at sea level, Woodward Type UG-8 Governor | |||
UNIT#1 | UNIT#2 | UNIT#3 | UNIT#4 | |
---|---|---|---|---|
Engine Hours (since overhaul) |
14,402 |
5,236 |
31,051 |
unknown |
Engine Hours (total meter reading since new) |
73,102 |
74,260 |
75,856 |
unknown |
Alternator | (4) General Electric 1000kVA @ 514 RPM, Power Factor 0.8, Type ATI, 4160/2400 Volts, 800 kW, 3 phase, Amp Field 71, Exciter Volts 125, 60 Hz, Main Amp 139/241 A | |||
Switchgear | Complete DELTA switchgear, 3 phase, 120/208 VAC, suitable for paralleling and deparalleling, synchronization, control and protection | |||
Fittings | Kohler Gas Engine driven air start compressor Worthington with 2 GE motors and | |||
(3) Air Pressure Tanks @ 250 psi | ||||
(2) Oil Bath Air Cleaners with all piping, controls and heat exchangers | ||||
Electric Distribution Panel | ||||
(4)Vertical Exhaust Silencers |
For Detailed Equipment Specifics, US $5,000 Cash Advance is required and a "Non-Disclosure, Non-Compete, Non-Circumvent Agreement" must be signed by the end-user; It will take three (3) weeks to prepare the Detailed Equipment Specifics.
The inspection of the Facility and the Equipment will be arranged upon receipt of US $1,000 non-refundable fee. Buyer shall have thirty (30) days to perform "due diligence" At the end of this "due diligence" period, the contract will be signed.
TERMS OF SALESold as is, where is.